Installation Terms

Precast concrete tanks

Binding Patterns

For the handling of manufactured goods always rely on qualified personnel, suitable and equipped as provided by the current provisions of law. Use means of transport, vehicles and lifting devices of adequate capacity in relation to the weights of the individual products verified on the technical drawings of the prefabricated goods which can be downloaded from the site.

Monoblock Tanks

Download .pdf


Terrain with poor mechanical characteristics
(e.g. limes, loose clays)
Terrain with poor mechanical characteristics

Terrain with good mechanical characteristics
(e.g. thickened sands, solid clays)
Terrain with good mechanical characteristics

Terrain with presence of Groundwater
(e.g. -50cm from the country plan)
Terrain with presence of Groundwater

Overground Positioning
Overground Positioning

1) Ground level
2) Coating material
3) Cover slab
4) Layer of sand s=5cm
5) Foundation at work sp. 20cm double net Ø8/20"x20"
6) Cleaning jet, H=10cm
7) Groundwater
8) Sealing with cement mortar
9) Reinforced concrete curb made at work


* provide for an increased excavation of a measure not less than 0.5 m and not more than 1m on each side of the tank and carry out the reburial with gravel of 40/60 mm

The verification of the product can be considered valid in compliance with the loading conditions and assumptions indicated in the Standard Structural Calculation Report.

Modular Tanks

Placement with presence of Groundwater
Placement with presence of Groundwater

1) Ground level
2) Coating material
3) Cover slab
4) Structural links between modules
5) Foundation at work sp. 20cm double net Ø8/20"x20"
6) Cleaning jet, H=10cm
7) Groundwater
8) Sealing with cement mortar
9) Reinforced concrete curb made at work

* provide for an increased excavation of a measure not less than 0.5 m and not more than 1m on each side of the tank and carry out the reburial with gravel of 40/60 mm

The verification of the product can be considered valid in compliance with the loading conditions and assumptions indicated in the Standard Structural Calculation Report.

Placement in absence of Groundwater
Placement in absence of Groundwater

Overground Positioning
Overground Positioning